当前位置: 首页 > 美军标 MIL > MIL-HDBK > MIL-HDBK-348(USAF) (NOTICE 1)
MIL-HDBK-348(USAF) (NOTICE 1)
世界资料网 / 2022-12-09
MIL-HDBK-348(USAF) (NOTICE 1), SATELLITE CONTROL NETWORK HARDWARE AND SOFTWARE OPERATIONAL ACCEPTANCE PROCESS. This document establishes the baseline for the site technical acceptance, and the procedures for turnover to site operations, of ground equipment and associated computer software in the Air Force Satellite Control Network (AFSCN). This includes transitioning modifications or upgrades of the existing resources to operational capability and the transfer of operations and maintenance responsibility from the implementing to the operating agencies. Status codes are established and defined for standardized progress reporting of hardware modifications or installations and the associated documentation. This handbook also contains definitions applicable to the satellite control network.
关键字: MIL-HDBK-3 NOTICE
上一篇:MIL-HDBK-349
下一篇:MIL-HDBK-347

用户评论(共0条评论)

  • 暂时还没有任何用户评论
总计 0 个记录,共 1 页。 第一页 上一页 下一页 最末页
用户名: 匿名用户
E-mail:
评价等级:
评论内容: